1 What work and rate mean
Meena is painting a wall. Working alone, at the same pace every day, she takes 6 days.
Cut the wall into 6 equal strips. Each day she paints one strip. So each day she paints of the wall.
After 4 days she has painted 4 strips: of the wall. One third is still left.
Words to know
- The job, or the work, is the whole task: one wall, one order of shirts, one room to clean. We count it as 1.
- The rate is the work done in one day (or one hour). It is also called efficiency: a more efficient worker has a higher rate.
- The time is how long someone works, in days or hours.
Unless a question says otherwise, every person works at the same rate every day.
When the work can be counted
Imtiaz, a tailor, stitches 40 shirts in 8 days. His rate is shirts a day.
In 3 days he stitches shirts. To stitch 60 shirts he needs days.
Here the work has a count: shirts. A wall has no count, so we call the whole wall 1 job. The rule does not change.
- Work is the part of the job done: a fraction of 1, or a count such as shirts. Rate is the work in one day. Time is the number of days.
- is the number of days the person takes to do the whole job alone.
- Use it in every question. The first step is always to turn each person into a rate.
- Tiny use: alone in 8 days means of the job a day, so 3 days give of the job.
- The common slip: writing the rate as 8. The time is 8 days; the rate is .
Turn the rule round and it gives the time: time = work ÷ rate.
More rate, less time
The faster a person works, the fewer days the job takes. Rate × time is always one job.
| Alone in | Rate (part a day) | Part done in 2 days |
|---|---|---|
| 2 days | , the whole job | |
| 4 days | ||
| 5 days | ||
| 8 days |
Example 1Basic
Arif can paint a fence alone in 10 days. (i) What part of the fence does he paint in 3 days? (ii) How many more days does he need to finish it?
See the solution
Step 1: Rate of the fence a day
Step 2: Work in 3 days
Step 3: Work left
Step 4: Time for the rest days
Check: days, his full time alone
Answer: (i) (ii) 7 more days
Example 2Exam level
A packing machine packs a shop's whole order in 8 hours. It runs for 3 hours in the morning and 2 hours in the evening. What part of the order is still unpacked, and how many more hours will the machine need?
See the solution
Step 1: Rate of the order an hour
Step 2: Hours run so far
Step 3: Work done
Step 4: Left
Step 5: Time hours
Check: hours in all, the machine's full time
Answer: of the order is left; 3 more hours
A tap filling a tank follows the same rule: the tank is its job.
A leak is a worker who undoes work. The Pipes & Cisterns page adds that minus sign.
Try it
Rashmi reads a novel at a steady pace and finishes it in 12 days. What part does she read in 5 days? How many days does she need to read of it?
Section 2 puts two people on the same job, and shows the two ways Indian classrooms solve it.
Check yourself · 5 questions
Vinod does of a job each day, and Wasim does of the same job each day. Working alone, how many more days does Wasim need than Vinod to finish the whole job?